본문 바로가기

Building Performance Management Business

Comprehensive Performance Management and Improvement Measures for Existing Buildings (Energy and Safety Performance, etc.)

We are preparing customized improvement measures to maintain the overall performance of existing buildings and maintain optimal performance of buildings, and provide professional and systematic management methods that satisfy the national policy direction and customer needs.

Building Performance Management
Business

  • Efficient Performance Improvement Plan through Comprehensive Performance Management of Existing Buildings
  • Various Performance Management Projects in Progress for Public Institutions, Local Governments, and Companies

Vulnerable District Energy Improvement Business

  • Contributing to Public Welfare and Greenhouse Gas Reduction Policies through Continuous Progress in Improving Energy Performance in Vulnerable Districts
  • Completion of Projects for 3 Facilities in 2018, Promotion of 5 Facilities in 2019

Building Energy Performance Evaluation Simulation Program Training and Support

  • Training and Support for Simulation Programs through Visits to Local Universities
  • Selected and Promoted 3 Universities in 2018 and 4 Universities in 2019
KBeT-한국건물에너지기술원-건축물에너지성능개선솔루션-01

Comprehensive Performance Management and Improvement of Buildings (Energy and Safety Performance, etc.)

  • Chungnam National University Facilities [Space] Master Plan Establishment (Chungnam National University)
  • Ulsan Metropolitan City Green Building Design Standards and Guidelines (Ulsan University)
  • KEMS Performance Verification(M&V) Analysis and Energy Requirements Evaluation (KINTEX, Hancom MDS)
  • Smart Energy Analysis Campaign Technical Support Group (Korea Energy Agency)
  • Diagnosis of the Performance Level of the Korea Electric Power Corporation Association (KEPCO Energy Solution)
  • Diagnosis of K-BEMS Energy Performance Level (Korea Electric Power Corporation)
  • Measurement and Research Related to Energy Conservation Plan Review Criteria (Korea Energy Agency)
  • Production of Technical Data of Energy Saving Plan (Korea Energy Agency)

Vulnerable District Energy Improvement Business

  • Contribution to Public Welfare and Greenhouse Gas Reduction Policy
    through Continuous Progress in Improving Energy Performance in Vulnerable Districts
  • Completion of Projects for 3 Facilities in 2018, Promotion for 5 Facilities in 2019

Vulnerable District Energy Improvement Business

  • Contribution to Public Welfare and Greenhouse Gas Reduction Policy through Continuous Progress in Improving Energy Performance in Vulnerable Districts
  • Completion of Projects for 3 Facilities in 2018, Promotion for 5 Facilities in 2019

Energy Performance Evaluation and Performance Improvement Plan

  • Target Buildings: Hwanhee Love Nursery Center (Asan-si, Chungcheongnam-do)
  • Main Use: Youth and Silver facility (Child Related Facility)
  • Site Survey: 2018.04.10.
  • Confidentiality Measurement: 2018.04.10.(Existing and New Buildings)
  • Energy Performance Evaluation: 2018.04.11. ~ 2018.04.27.
  • Achievement: Derive Performance Improvement(Proposal) through Energy Performance Evaluation Results

※ Performance Improvement(Proposal) for Heating and hot Water Supply Methods

Window Performance Improvement Construction

  • Target Buildings: Hyemyeong Nursery Center (Geumcheon-gu, Seoul)
  • Main Use: Youth and Silver facility (Child Related Facility)
  • Site Survey: 2018.06.14.
  • Confidentiality Measurement: 2018.06.18.(Before Improvement), 2018.07.31.(After Improvement)
  • Improvement Work: 2018.07.27. ~ 2018.07.28.
  • Energy Performance Evaluation: 2018.06.19. ~ 2018.08.03.
  • Achievement: Construction of Window Performance Improvement for the Restaurant on the First Basement Floor

※ (Before Improvement) Double-layer Window, Metal Window Frame → (After Improvement) Quadruple Window, Plastic Window Frame

Improvement of Water Pressure and Application of a Freeze/Fire Prevention System (Metal Heat)

  • Target Buildings: Lira Children’s Welfare Center (Anseong-si, Gyeonggi-do)
  • Main Use: Youth and Silver facility (Child Related Facility)
  • Site Survey: 2018.09.18.
  • Improvement Work: 2018.10.15.
  • Achievement: Improve Water Pressure Performance Distributed through Direct Water Pipe Connection and Apply Freeze/Fire Prevention System

※ (Before Improvement) Supply through Rooftop Water Tank → (After Improvement) Direct Supply

Training and Support for Building Energy Performance Evaluation Simulation Program

• Training and Support for Simulation Programs through Visits to Local Universities
• Selected and Promoted 3 Universities in 2018 and 4 Universities in 2019

Ulsan University Simulation Program Education (Ulsan Metropolitan City)

Daejin University Simulation Program Education (Pocheon)

Dongeui University Simulation Program Education (Busan Metropolitan City)

We provide successful R&D performance and know-how with various products and solutions.